TIRED CREEK ROAD over TURKEY CREEK

APP 5.5 MI SW OF CAIRO · County 131, Georgia · Built 1960 · 2 Lanes · 420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000013150580
Year Built
1960
Length
36.6 m (120.1 ft)
Max Span
9.1 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
420
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.