COUNTY LINE ROAD over POLECAT CREEK

IN INDUSTRIAL CITY · County 129, Georgia · Built 2009 · 2 Lanes · 190 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012950970
Year Built
2009
Length
39.6 m (129.9 ft)
Max Span
18.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
190
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.