SR 53 over PINE LOG CREEK

5.5 MI W OF FAIRMOUNT · County 129, Georgia · Built 2001 · 2 Lanes · 4,920 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012950830
Year Built
2001
Length
72.2 m (236.9 ft)
Max Span
24.1 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
4,920
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$926,000
Total Project Cost
$1,389,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.