SAM HUNT ROAD over SALACOA CREEK

2 MI NW OF FAIRMOUNT · County 129, Georgia · Built 1993 · 2 Lanes · 220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012950370
Year Built
1993
Length
24.4 m (80.1 ft)
Max Span
12.2 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
220
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.