CHALKER ROAD over ROCKY COMFORT CREEK

1.7 MI NW OF GIBSON · County 125, Georgia · Built 1985 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012550030
Year Built
1985
Length
51.8 m (169.9 ft)
Max Span
18.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$664,000
Total Project Cost
$996,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.