SR 123 over FORDS CREEK

2.5 MI NW OF MITCHELL · County 125, Georgia · Built 1957 · 2 Lanes · 320 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000012500080
Year Built
1957
Length
41.1 m (134.8 ft)
Max Span
13.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
320
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$527,000
Total Project Cost
$791,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.