US 76 over SR 52- CARTECAY RIVER

IN EAST ELLIJAY · County 123, Georgia · Built 1982 · 4 Lanes · 22,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012300430
Year Built
1982
Length
135.6 m (444.9 ft)
Max Span
25.9 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
22,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.