MCDONOUGH BLVD. over NORFOLK-SOUTHERN RR
0.3 MI E OF SR 54 · County 121, Georgia · Built 2021 · 2 Lanes · 5,750 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.717361, -84.379861
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 5 years old.
Nearby Bridges
LAKEWOOD AVE. over NS RAILROAD
Built 2001
I-75 over SR 54 UNIVERSITY AVENUE
Built 1986
CLAIRE DRIVE over SOUTH RIVER TRIB
Built 1928
THORNTON STREET over SOUTH RIVER TRIB
Built 1955
I-75 over CSX RAILROAD
Built 1954
AUTHER LANGFORD RD over SOUTH RIVER TRIB
Built 1958
I-75 over SOUTH RIVER TRIB.
Built 1964
PRYOR STREET over I-75
Built 1986
PRYOR ROAD over SOUTH RIVER TRIB
Built 1935
WOODLAND ROAD over INTRENCHMENT CREEK
Built 1932
Bridge Details
- Structure #
- 000000012154010
- Year Built
- 2021
- Length
- 85 m (278.9 ft)
- Max Span
- 40.8 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 5,750
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $23,088,000
- Total Project Cost
- $34,632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.