PORTER TERRY ROAD over LITTLE PEA CREEK

6 MI N OF PALMETTO · County 121, Georgia · Built 2015 · 2 Lanes · 323 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000012153650
Year Built
2015
Length
11.6 m (38.1 ft)
Max Span
3.7 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
323
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,404,000
Total Project Cost
$5,106,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.