DONALD LEE HOWELL over CSX RAILROAD(ABANDONED)

IN WEST ATLANTA · County 121, Georgia · Built 2012 · 2 Lanes · 28,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012153490
Year Built
2012
Length
22.3 m (73.2 ft)
Max Span
22.3 m
Width
35 m (114.8 ft)
Lanes
2
Daily Traffic
28,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$285,000
Total Project Cost
$428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.