US 29 SR 14 ALT ( over LINE CREEK

4.3 MI W OF UNION CITY · County 121, Georgia · Built 1994 · 2 Lanes · 7,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012152670
Year Built
1994
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
7,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.