HOBGOOD ROAD over BEAR CREEK

3 MI NE OF PALMETTO · County 121, Georgia · Built 1960 · 2 Lanes · 4,991 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000012150910
Year Built
1960
Reconstructed
1985
Length
18.3 m (60 ft)
Max Span
9.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
4,991
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$234,000
Total Project Cost
$352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.