THOMPSON ROAD over CHICKEN CREEK TRIB

4 MI N OF ALPHARETTA · County 121, Georgia · Built 1962 · 2 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000012150090
Year Built
1962
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.