LOOP ROAD over FLINT RIVER

ATLANTA AIRPORT · County 121, Georgia · Built 1984 · 4 Lanes · 7,906 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000012105790
Year Built
1984
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
7,906
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$163,000
Total Project Cost
$245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.