COFIELD DRIVE over I-85

IN HAPEVILLE · County 121, Georgia · Built 1963 · 2 Lanes · 2,047 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012104710
Year Built
1963
Length
68 m (223.1 ft)
Max Span
19.2 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
2,047
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$871,000
Total Project Cost
$1,307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.