SR 13 over CLEAR CREEK

IN N ATLANTA · County 121, Georgia · Built 1963 · 4 Lanes · 29,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102060
Year Built
1963
Reconstructed
1983
Length
64.3 m (211 ft)
Max Span
26.2 m
Width
27.4 m (89.9 ft)
Lanes
4
Daily Traffic
29,600
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,274,000
Total Project Cost
$1,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.