STAGECOACH ROAD over I-85

1.1 MI NW OF CARNESVILLE · County 119, Georgia · Built 2019 · 4 Lanes · 90 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011951130
Year Built
2019
Length
81.3 m (266.7 ft)
Max Span
41.5 m
Width
9.5 m (31.2 ft)
Lanes
4
Daily Traffic
90
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,680,000
Total Project Cost
$35,520,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.