NEAL ROAD over I-85

9.3 MI SW OF CARNESVILLE · County 119, Georgia · Built 2018 · 2 Lanes · 70 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000011951120
Year Built
2018
Length
82.3 m (270 ft)
Max Span
42.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
70
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,976,000
Total Project Cost
$35,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.