SR 63 over LEATHERWOOD CREEK

10 M NW OF CARNESVILLE · County 119, Georgia · Built 1963 · 2 Lanes · 2,010 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000011900490
Year Built
1963
Length
40.2 m (131.9 ft)
Max Span
10.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,010
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$516,000
Total Project Cost
$774,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.