SR369 over SR400

4.5M NE OF CUMMING · County 117, Georgia · Built 2022 · 4 Lanes · 19,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000011750620
Year Built
2022
Length
86.6 m (284.1 ft)
Max Span
43.3 m
Width
31.2 m (102.4 ft)
Lanes
4
Daily Traffic
19,300
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,234,000
Total Project Cost
$37,851,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.