UNION HILL ROAD over SR 400 (US 19)

0.65 MI N FULTON CO LN · County 117, Georgia · Built 2019 · 4 Lanes · 4,990 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011750590
Year Built
2019
Length
80.5 m (264.1 ft)
Max Span
40.2 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
4,990
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$23,458,000
Total Project Cost
$35,187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.