BUFORD DAM ROAD over SR 400 (US 19)

SE CUMMING CITY LIMITS · County 117, Georgia · Built 1974 · 2 Lanes · 9,560 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011700350
Year Built
1974
Length
105.8 m (347.1 ft)
Max Span
30.8 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
9,560
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,356,000
Total Project Cost
$2,034,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.