SR 141 over SR 400 (US 19)

4 MI SW OF CUMMING · County 117, Georgia · Built 1973 · 4 Lanes · 41,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000011700130
Year Built
1973
Reconstructed
2008
Length
92 m (301.8 ft)
Max Span
28.3 m
Width
29.7 m (97.4 ft)
Lanes
4
Daily Traffic
41,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,824,000
Total Project Cost
$2,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.