SR 1 CW/SB LOOP over MOUNTAIN END LAKE

6.5 M W OF ROME · County 115, Georgia · Built 2015 · 2 Lanes · 6,470 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000011551050
Year Built
2015
Length
57.9 m (190 ft)
Max Span
24.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
6,470
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,872,000
Total Project Cost
$25,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.