SR 1 CCW/NB RAMP over DRY CREEK

6.7 MI N OF CAVE SPRINGS · County 115, Georgia · Built 2010 · 2 Lanes · 6,821 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000011550990
Year Built
2010
Length
10.1 m (33.1 ft)
Max Span
1.8 m
Lanes
2
Daily Traffic
6,821
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$129,000
Total Project Cost
$193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.