SR 53 over DOZIER CREEK

2.5 MI SW OF SHANNON · County 115, Georgia · Built 1980 · 5 Lanes · 18,400 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000011500400
Year Built
1980
Length
13.1 m (43 ft)
Max Span
3 m
Lanes
5
Daily Traffic
18,400
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$305,000
Total Project Cost
$458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.