SR 53-US 411 over CEDAR CREEK

2.5 MI NE OF CAVE SPRING · County 115, Georgia · Built 1928 · 2 Lanes · 4,040 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000011500380
Year Built
1928
Reconstructed
1966
Length
67.1 m (220.1 ft)
Max Span
13.7 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
4,040
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$860,000
Total Project Cost
$1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.