HIDDEN VALLEY DR over HEMPTOWN CREEK

1.4 MI N OF MORGANTON · County 111, Georgia · Built 1990 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000011150400
Year Built
1990
Length
26.5 m (86.9 ft)
Max Span
26.5 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
323
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$340,000
Total Project Cost
$510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.