SR 169 over CANOOCHEE RIVER

0.5 MILES NORTH OF INTERS · County 109, Georgia · Built 2024 · 2 Lanes · 2,150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000010950260
Year Built
2024
Length
131.1 m (430.1 ft)
Max Span
21.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$38,184,000
Total Project Cost
$57,276,000