CR 117 over SCOTT CREEK OVERFLOW

6 MI NE OF CLAXTON · County 109, Georgia · Built 1983 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000010950120
Year Built
1983
Length
32 m (105 ft)
Max Span
6.4 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
60
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$410,000
Total Project Cost
$615,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.