US 280 over CANOOCHEE RIVER

7 MI E OF CLAXTON · County 109, Georgia · Built 1986 · 2 Lanes · 5,640 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000010900300
Year Built
1986
Length
131.4 m (431.1 ft)
Max Span
21 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
5,640
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,684,000
Total Project Cost
$2,526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.