SR 297 over OHOOPEE RIVER

4.1 MI SW OF NUNEZ · County 107, Georgia · Built 1975 · 2 Lanes · 1,490 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000010700620
Year Built
1975
Length
127.4 m (418 ft)
Max Span
11.6 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,490
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,633,000
Total Project Cost
$2,450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.