US 80 / SR 26 over FIFTEEN MILE CREEK

3.5 MI E OF TWIN CITY · County 107, Georgia · Built 1928 · 2 Lanes · 2,390 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000010700220
Year Built
1928
Reconstructed
1963
Length
73.2 m (240.2 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,390
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.