SR 62 over DRY CREEK

3.7 MI E OF BLAKELY · County 099, Georgia · Built 1937 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009900110
Year Built
1937
Length
47.5 m (155.8 ft)
Max Span
7.9 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
2,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$610,000
Total Project Cost
$914,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.