US 19/SR 3 (SBL) over SR 520 BUSINESS

ALBANY - EASTSIDE · County 095, Georgia · Built 1974 · 2 Lanes · 2,130 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009500280
Year Built
1974
Length
63.4 m (208 ft)
Max Span
20.4 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
2,130
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$813,000
Total Project Cost
$1,219,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.