THIRD DISTRICT ROA over CEDAR CREEK

8.7 MI SE OF UNADILLA · County 093, Georgia · Built 1956 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009300500
Year Built
1956
Reconstructed
2005
Length
24.4 m (80.1 ft)
Max Span
6.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$313,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.