RIVER ROAD over HOGCRAWL CREEK

3 MI WNW BYROMVILLE · County 093, Georgia · Built 1995 · 2 Lanes · 360 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009300430
Year Built
1995
Length
79.2 m (259.8 ft)
Max Span
12.2 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
360
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,016,000
Total Project Cost
$1,524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.