SR 230 over BIG BRANCH

8.3 MILES NW OF RHINE · County 091, Georgia · Built 2021 · 2 Lanes · 540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000009150270
Year Built
2021
Length
40.2 m (131.9 ft)
Max Span
17.7 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
540
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$21,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.