EMPIRE-CHESTER HWY over GUM SWAMP CREEK

4.7 MI SW OF CHESTER · County 091, Georgia · Built 1958 · 2 Lanes · 1,280 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000009100300
Year Built
1958
Length
115.2 m (378 ft)
Max Span
8.2 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
1,280
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,477,000
Total Project Cost
$2,215,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.