MEMORIAL DRIVE over I-285 (SR 407)

5 MI E OF DECATUR · County 089, Georgia · Built 2008 · 10 Lanes · 40,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008951620
Year Built
2008
Length
117 m (383.9 ft)
Max Span
36.6 m
Width
48.3 m (158.5 ft)
Lanes
10
Daily Traffic
40,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,774,000
Total Project Cost
$7,161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.