ROCK CHAPEL ROAD over MOUNTAIN CREEK

3.5 MI NE OF LITHONIA · County 089, Georgia · Built 2000 · 5 Lanes · 36,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008951440
Year Built
2000
Length
57.6 m (189 ft)
Max Span
27.1 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
36,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,343,000
Total Project Cost
$2,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.