BROWNS MILL ROAD over POLE BRIDGE CREEK

5 MI SE OF LITHONIA · County 089, Georgia · Built 1998 · 2 Lanes · 13,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008951430
Year Built
1998
Length
74.4 m (244.1 ft)
Max Span
27.1 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
13,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$953,000
Total Project Cost
$1,430,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.