N. DEKALB MALL ACC over S FORK PEACHTREE CREEK

3.5 MI SW OF CLARKSTON · County 089, Georgia · Built 1967 · 2 Lanes · 2,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008950630
Year Built
1967
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
2,950
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.