EAST ROCK SPRINGS over S FORK PEACHTREE CREEK

3 MI NW OF DECATUR · County 089, Georgia · Built 1958 · 2 Lanes · 8,140 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000008950420
Year Built
1958
Length
6.4 m (21 ft)
Max Span
3 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
8,140
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$82,000
Total Project Cost
$123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.