RIVER ROAD over CONLEY CREEK

7.4 MI SE OF DECATUR · County 089, Georgia · Built 1958 · 2 Lanes · 18,106 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000008950030
Year Built
1958
Length
25 m (82 ft)
Max Span
8.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
18,106
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$320,000
Total Project Cost
$481,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.