ARCADIA AVE./SAMS over MARTA- CSX RAILROAD

1 MI E OF DECATUR · County 089, Georgia · Built 1979 · 5 Lanes · 15,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008902620
Year Built
1979
Length
91.4 m (299.9 ft)
Max Span
33.5 m
Width
20.4 m (66.9 ft)
Lanes
5
Daily Traffic
15,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$2,131,000
Total Project Cost
$3,197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.