SOUTH HAIRSTON RD over SNAPFINGER CREEK

3.5 MI S OF PINE LAKE · County 089, Georgia · Built 1993 · 4 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008901430
Year Built
1993
Length
35.1 m (115.2 ft)
Max Span
35.1 m
Width
26.3 m (86.3 ft)
Lanes
4
Daily Traffic
19,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$694,000
Total Project Cost
$1,042,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.