NEW HOME CH RD over BIG SLOUGH
13 MI NE OF BAINBRIDGE · County 087, Georgia · Built 1995 · 2 Lanes · 160 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.036694, -84.383686
This bridge is in worse condition than 31.1% of bridges in County 087. The average bridge in Georgia is 0 years old; this one is 31 years old.
Nearby Bridges
SR 262 over BIG SLOUGH
Built 1992
JESSIE BROCK RD over BIG SLOUGH
Built 1970
MARS HILL CH ROAD over BLACK LAKE TRIB
Built 1989
SR 262 over BIG SLOUGH OVERFLOW
Built 1992
SR 262 over BIG SLOUGH
Built 1992
ROBINSON-MITCHELL over BLACK LAKE TRIB
Built 1993
TOM MAXWELL RD over BLACK LAKE TRIB
Built 1990
HARRELL ROAD over KELLY CREEK TRIB
Built 1980
MAXWELL ROAD over BLACK LAKE TRIB
Built 1990
OLD 179 N over KELLY CREEK
Built 1935
Bridge Details
- Structure #
- 000000008750560
- Year Built
- 1995
- Length
- 54.9 m (180.1 ft)
- Max Span
- 6.1 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $703,000
- Total Project Cost
- $1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.