SR 53 over ETOWAH RIVER

4.3 MI SE OF DAWSONVILLE · County 085, Georgia · Built 1980 · 2 Lanes · 16,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000008500120
Year Built
1980
Length
66.8 m (219.2 ft)
Max Span
22.9 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$856,000
Total Project Cost
$1,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.