I-24 EBL over I-59 CONN TO I-24 W
IN JCT. OF I-59 AND I-24 · County 083, Georgia · Built 2003 · 2 Lanes · 48,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.971692, -85.451819
This bridge is in worse condition than 38.4% of bridges in County 083. The average bridge in Georgia is 0 years old; this one is 23 years old.
Nearby Bridges
RMP I-59N TO I-24W over POPE CREEK
Built 1967
I-59 (SBL) over POPE CREEK
Built 1965
I-59 SBL over I-59 CONN TO I-24 W
Built 2003
I-24 EBL (SR 409) over I-59 SBL (SR 406)
Built 2003
I-24 (EBL) over POPE CREEK
Built 1965
I-24 (WBL) @ I-59 over POPE CREEK
Built 1965
SLYGO ROAD over I-24 (SR 409)- POPE CRK
Built 1966
I-24 (WBL) over POPE CREEK TRIB.
Built 1965
I-24 (EBL) over POPE CREEK
Built 1965
DUGAN LOOP over I-59 (SR 406)
Built 1967
Bridge Details
- Structure #
- 000000008350310
- Year Built
- 2003
- Length
- 41.8 m (137.1 ft)
- Max Span
- 41.8 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 48,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $535,000
- Total Project Cost
- $803,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.